The section of the HS2 railway between Parkway and Hampstead Road in Camden is referred to as the Euston Approaches, and it is designed to connect the line to Euston Station. It is currently a building site.
A lot of the largest excavations needed to construct the Euston Approaches tunnels have been paused.
This includes pausing the construction of a concrete box that was intended to be a covered section along the railway line where trains would enter and exit tunnels.
Other work includes tunnelling and creating a wider and deeper railway called the Euston Throat, which would make room for HS2.